2309 EX 9

Rutuja
Rutuja Choudhari
Created on Jan 12, 2022 0 0 1
2309 EX 9
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-1 (74LS74).
  2. Connect GND Port to Pin-1 (Input) of ICBase-1 (74LS74).
  3. Connect Input-15 to Pin-2 (Input) of ICBase-1 (74LS74).
  4. Connect Clock port of 1Hz frequency to Pin-3 (Input) of ICBase-1 (74LS74).
  5. Connect Output-14 to Pin-5 (Output) of ICBase-1 (74LS74).
  6. Connect Output-13 to Pin-6 (Output) of ICBase-1 (74LS74).
  7. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS74).