A5 MUX

Sarthak
Sarthak Zambre
Created on Jan 19, 2022 0 0 1
A5 MUX
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-8 (Ground) of ICBase-1 (74LS151).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS151).
  3. Connect GND Port to Pin-7 (Input) of ICBase-1 (74LS151).
  4. Connect Input-2 to Pin-13 (Input) of ICBase-1 (74LS151).
  5. Connect Input-1 to Pin-14 (Input) of ICBase-1 (74LS151).
  6. Connect Input-0 to Pin-15 (Input) of ICBase-1 (74LS151).
  7. Connect VCC Port to Pin-2 (Input) of ICBase-1 (74LS151).
  8. Connect VCC Port to Pin-4 (Input) of ICBase-1 (74LS151).
  9. Connect VCC Port to Pin-19 (Input) of ICBase-1 (74LS151).
  10. Connect VCC Port to Pin-16 (Input) of ICBase-1 (74LS151).
  11. Connect GND Port to Pin-1 (Input) of ICBase-1 (74LS151).
  12. Connect GND Port to Pin-18 (Input) of ICBase-1 (74LS151).
  13. Connect GND Port to Pin-17 (Input) of ICBase-1 (74LS151).
  14. Connect Output-0 to Pin-5 (Output) of ICBase-1 (74LS151).
  15. Add IC 74LS151 into ICBase-1 (74LS151).