06

Shekhar
Shekhar Bhide
Created on Dec 5, 2021 0 0 1
06
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-5 (74LS90).
  2. Connect VCC Port to Pin-5 (VCC) of ICBase-5 (74LS90).
  3. Add IC 74LS90 into ICBase-4 (74LS90).
  4. Connect VCC Port to Pin-5 (VCC) of ICBase-4 (74LS90).
  5. Connect GND Port to Pin-16 (Ground) of ICBase-4 (74LS90).
  6. Connect GND Port to Pin-16 (Ground) of ICBase-5 (74LS90).