test

Rasi
Rasi kp
Created on Aug 18, 2021 0 0 1
test
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS08 into ICBase-1 (74LS08).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  4. Connect Input-15 to Pin-1 (Input) of ICBase-1 (74LS08).
  5. Connect Input-14 to Pin-2 (Input) of ICBase-1 (74LS08).
  6. Connect Input-13 to Pin-5 (Input) of ICBase-1 (74LS08).
  7. Connect Pin-15 (Input) of ICBase-1 (74LS08) to Pin-6 (Output) of ICBase-1 (74LS08).
  8. Connect Pin-16 (Input) of ICBase-1 (74LS08) to Input-12.
  9. Connect Pin-4 (Input) of ICBase-1 (74LS08) to Pin-3 (Output) of ICBase-1 (74LS08).
  10. Connect Output-15 to Pin-14 (Output) of ICBase-1 (74LS08).