(A.B)'

Nithin
Nithin Raj R
Created on Aug 13, 2021 0 0 2
(A.B)'
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to ICBase-2 (74LS04).
  2. Add IC 74LS08 into ICBase-1 (74LS08).
  3. Add IC 74LS04 into ICBase-2 (74LS04).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  6. Connect Input-15 to Pin-1 (Input) of ICBase-1 (74LS08).
  7. Connect Pin-2 (Input) of ICBase-1 (74LS08) to Input-14.
  8. Connect Output-15 to Pin-3 (Output) of ICBase-1 (74LS08).
  9. Connect Input-13 to Output-15.
  10. Connect Pin-1 (Input) of ICBase-2 (74LS04) to Input-13.
  11. Connect Output-14 to Pin-2 (Output) of ICBase-2 (74LS04).
  12. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).
  13. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).