a2

Rashi
Rashi Bansal
Created on Aug 11, 2021 0 0 1
a2
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-8 (Ground) of ICBase-3 (74LS153).
  2. Connect GND Port to Pin-1 (Input) of ICBase-3 (74LS153).
  3. Connect Input-2 to Pin-2 (Input) of ICBase-3 (74LS153).
  4. Connect Input-1 to Pin-18 (Input) of ICBase-3 (74LS153).
  5. Connect Output-0 to Pin-7 (Output) of ICBase-3 (74LS153).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS153).
  7. Connect Input-7 to Pin-3 (Input) of ICBase-3 (74LS153).
  8. Connect Input-6 to Pin-4 (Input) of ICBase-3 (74LS153).
  9. Connect Input-5 to Pin-5 (Input) of ICBase-3 (74LS153).
  10. Connect Input-4 to Pin-6 (Input) of ICBase-3 (74LS153).
  11. Add IC 74LS153 into ICBase-3 (74LS153).