DE practical 1(b)

Siddhanth
Siddhanth Upadhyaya
Created on Aug 5, 2021 0 0 1
DE practical 1(b)
100%

Integrated Circuits Used

Procedure

  1. Connect Output-7 to Input-7.
  2. Connect Input-6 to Pin-2 (Input) of ICBase-2 (74LS86).
  3. Connect Output-4 to Pin-14 (Output) of ICBase-2 (74LS86).
  4. Connect Pin-4 (Input) of ICBase-2 (74LS86) to Pin-3 (Output) of ICBase-2 (74LS86).
  5. Connect Pin-15 (Input) of ICBase-2 (74LS86) to Pin-6 (Output) of ICBase-2 (74LS86).
  6. Add IC 74LS86 into ICBase-2 (74LS86).
  7. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS86).
  8. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS86).
  9. Connect Input-7 to Pin-1 (Input) of ICBase-2 (74LS86).
  10. Connect Output-6 to Pin-3 (Output) of ICBase-2 (74LS86).
  11. Connect Input-5 to Pin-5 (Input) of ICBase-2 (74LS86).
  12. Connect Output-5 to Pin-6 (Output) of ICBase-2 (74LS86).
  13. Connect Input-4 to Pin-16 (Input) of ICBase-2 (74LS86).