SOP

Ishan
Ishan Oze
Created on Aug 19, 2021 0 0 1
SOP
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS153 into ICBase-3 (74LS153).
  2. Connect GND Port to Pin-8 (Ground) of ICBase-3 (74LS153).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS153).
  4. Connect VCC Port to Pin-6 (Input) of ICBase-3 (74LS153).
  5. Connect VCC Port to Pin-3 (Input) of ICBase-3 (74LS153).
  6. Connect Input-0 to Pin-2 (Input) of ICBase-3 (74LS153).
  7. Connect Pin-18 (Input) of ICBase-3 (74LS153) to Input-1.
  8. Connect GND Port to Pin-4 (Input) of ICBase-3 (74LS153).
  9. Connect GND Port to Pin-5 (Input) of ICBase-3 (74LS153).
  10. Connect GND Port to Pin-1 (Input) of ICBase-3 (74LS153).
  11. Connect Output-0 to Pin-7 (Output) of ICBase-3 (74LS153).