EXP 2_REDUCTION

Pratham
Pratham Palresha
Created on Aug 17, 2021 0 0 2
EXP 2_REDUCTION
100%

Integrated Circuits Used

Description

18-08-2021

Procedure

  1. Connect VCC Port to Pin-6 (Input) of ICBase-2 (74LS153).
  2. Connect GND Port to Pin-5 (Input) of ICBase-2 (74LS153).
  3. Connect Pin-2 (Output) of ICBase-1 (74LS04) to Pin-4 (Input) of ICBase-2 (74LS153).
  4. Connect Input-13 to Pin-1 (Input) of ICBase-1 (74LS04).
  5. Connect Input-13 to Pin-3 (Input) of ICBase-2 (74LS153).
  6. Connect GND Port to Pin-1 (Input) of ICBase-2 (74LS153).
  7. Connect Input-15 to Pin-2 (Input) of ICBase-2 (74LS153).
  8. Connect Input-14 to Pin-18 (Input) of ICBase-2 (74LS153).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS04).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS04).
  11. Connect GND Port to Pin-8 (Ground) of ICBase-2 (74LS153).
  12. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS153).
  13. Connect Output-15 to Pin-7 (Output) of ICBase-2 (74LS153).
  14. Add IC 74LS153 into ICBase-2 (74LS153).
  15. Add IC 74LS04 into ICBase-1 (74LS04).