EXP_1_B_G

Anagha
Anagha Deshpande
Created on Aug 3, 2021 0 0 1
EXP_1_B_G
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to ICBase-1 (74LS86).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS86).
  3. Connect Output-15 to Input-15.
  4. Connect Pin-1 (Input) of ICBase-1 (74LS86) to Input-15.
  5. Connect Pin-2 (Input) of ICBase-1 (74LS86) to Input-14.
  6. Connect Pin-3 (Output) of ICBase-1 (74LS86) to Output-14.
  7. Connect Pin-4 (Input) of ICBase-1 (74LS86) to Input-14.
  8. Connect Pin-5 (Input) of ICBase-1 (74LS86) to Input-13.
  9. Connect Pin-6 (Output) of ICBase-1 (74LS86) to Output-13.
  10. Connect Input-13 to Pin-15 (Input) of ICBase-1 (74LS86).
  11. Connect Pin-16 (Input) of ICBase-1 (74LS86) to Input-12.
  12. Connect Output-12 to Pin-14 (Output) of ICBase-1 (74LS86).
  13. Add IC 74LS86 into ICBase-3 (74LS86).
  14. Add IC 74LS86 into ICBase-1 (74LS86).
  15. Connect Pin-20 (VCC) of ICBase-1 (74LS86) to VCC Port.