first-deLAB

Yash
Yash Lad
Created on Aug 5, 2021 0 0 1
first-deLAB
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS86 into ICBase-2 (74LS86).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS86).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS86).
  4. Connect Input-11 to Pin-1 (Input) of ICBase-2 (74LS86).
  5. Connect Input-8 to Pin-2 (Input) of ICBase-2 (74LS86).
  6. Connect Output-9 to Pin-3 (Output) of ICBase-2 (74LS86).
  7. Connect Output-7 to Pin-6 (Output) of ICBase-2 (74LS86).
  8. Connect Output-4 to Pin-17 (Output) of ICBase-2 (74LS86).
  9. Connect Input-11 to Pin-4 (Input) of ICBase-2 (74LS86).
  10. Connect Input-8 to Pin-5 (Input) of ICBase-2 (74LS86).
  11. Connect Input-6 to Pin-19 (Input) of ICBase-2 (74LS86).
  12. Connect Input-3 to Pin-18 (Input) of ICBase-2 (74LS86).