oder_bausteine

sigrid
sigrid heizenreder
Created on May 18, 2022 0 0 1
oder_bausteine
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS32 into ICBase-1 (74LS32).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS32).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS32).
  4. Connect Pin-1 (Input) of ICBase-1 (74LS32) to Input-15.
  5. Connect Pin-2 (Input) of ICBase-1 (74LS32) to Input-14.
  6. Connect Output-13 to Pin-3 (Output) of ICBase-1 (74LS32).