SR NOR LATCH

Raunak
Raunak Kumar singh
Created on Jul 7, 2021 0 0 1
SR NOR LATCH
100%

Integrated Circuits Used

Procedure

  1. Connect Input-14 to Pin-2 (Input) of ICBase-1 (74LS02).
  2. Connect GND Port to ICBase-1 (74LS02).
  3. Connect Pin-7 (Ground) of ICBase-1 (74LS02) to GND Port.
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS02).
  5. Connect Input-13 to Pin-6 (Input) of ICBase-1 (74LS02).
  6. Connect Pin-3 (Input) of ICBase-1 (74LS02) to Pin-4 (Output) of ICBase-1 (74LS02).
  7. Connect Pin-5 (Input) of ICBase-1 (74LS02) to Pin-1 (Output) of ICBase-1 (74LS02).
  8. Connect Output-10 to Pin-1 (Output) of ICBase-1 (74LS02).
  9. Connect Output-9 to Pin-4 (Output) of ICBase-1 (74LS02).
  10. Add IC 74LS02 into ICBase-1 (74LS02).