sru

Putta
Putta Srujan
Created on Jul 12, 2021 0 0 1
sru
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-1 (74LS04).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS04).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS04).
  4. Connect Pin-1 (Input) of ICBase-1 (74LS04) to Input-14.
  5. Connect Output-1 to Input-14.
  6. Connect Output-2 to Pin-2 (Output) of ICBase-1 (74LS04).
  7. Connect GND Port to ICBase-1 (74LS04).