dg

Mahidi Hasan
Mahidi Hasan Mithun
Created on Aug 11, 2021 0 0 1
dg
100%

Integrated Circuits Used

Procedure

  1. Connect Input-15 to Pin-1 (Input) of ICBase-1 (74LS08).
  2. Connect Pin-2 (Input) of ICBase-1 (74LS08) to Input-14.
  3. Connect Output-12 to Pin-3 (Output) of ICBase-1 (74LS08).
  4. Add IC 74LS08 into ICBase-1 (74LS08).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).