Ed2

Dimitrie
Dimitrie Tănăsescu
Created on May 25, 2021 0 0 1
Ed2
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS21 into ICBase-1 (74LS21).
  2. Connect Pin-7 (Ground) of ICBase-1 (74LS21) to GND Port.
  3. Connect Output-13 to Pin-6 (Output) of ICBase-1 (74LS21).
  4. Connect Pin-2 (Input) of ICBase-1 (74LS21) to Input-1.
  5. Connect Pin-4 (Input) of ICBase-1 (74LS21) to Input-2.
  6. Connect Pin-5 (Input) of ICBase-1 (74LS21) to Input-3.
  7. Connect Pin-20 (VCC) of ICBase-1 (74LS21) to VCC Port.
  8. Connect Pin-1 (Input) of ICBase-1 (74LS21) to Manual clock Port.