SR LATCH

NIKHIL
NIKHIL DADI
Created on Jul 7, 2021 0 0 1
SR LATCH
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS02 into ICBase-2 (74LS02).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  4. Connect Pin-2 (Input) of ICBase-2 (74LS02) to Input-8.
  5. Connect Pin-14 (Input) of ICBase-2 (74LS02) to Input-2.
  6. Connect Pin-16 (Output) of ICBase-2 (74LS02) to Pin-3 (Input) of ICBase-2 (74LS02).
  7. Connect Pin-15 (Input) of ICBase-2 (74LS02) to Pin-1 (Output) of ICBase-2 (74LS02).
  8. Connect Output-6 to Pin-1 (Output) of ICBase-2 (74LS02).
  9. Connect Output-4 to Pin-16 (Output) of ICBase-2 (74LS02).
  10. Connect VCC Port to ICBase-1.