lab step 3

Arya
Arya D
Created on May 11, 2021 0 0 2
lab step 3
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  2. Connect Input-15 to Pin-4 (Input) of ICBase-1 (74LS08).
  3. Connect Input-14 to Pin-5 (Input) of ICBase-1 (74LS08).
  4. Connect Output-14 to ICBase-1 (74LS08).
  5. Connect Output-14 to Pin-6 (Output) of ICBase-1 (74LS08).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  7. Add IC 74LS08 into ICBase-1 (74LS08).
  8. Add IC 74LS04 into ICBase-2 (74LS04).
  9. Connect Input-5 to Pin-1 (Input) of ICBase-2 (74LS04).
  10. Connect Output-6 to Pin-2 (Output) of ICBase-2 (74LS04).
  11. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).
  12. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).