SIPO shift

Vedant
Vedant Kankate
Created on May 31, 2021 0 0 1
SIPO shift
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS194 into ICBase-2 (74LS194).
  2. Connect GND Port to Pin-8 (Ground) of ICBase-2 (74LS194).
  3. Connect Input-2 to Pin-14 (Input) of ICBase-2 (74LS194).
  4. Connect Input-3 to Pin-13 (Input) of ICBase-2 (74LS194).
  5. Connect Clock port of 1Hz frequency to Pin-15 (Input) of ICBase-2 (74LS194).
  6. Connect Output-8 to Pin-16 (Output) of ICBase-2 (74LS194).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS194).
  8. Connect Output-7 to Pin-17 (Output) of ICBase-2 (74LS194).
  9. Connect Output-6 to Pin-18 (Output) of ICBase-2 (74LS194).
  10. Connect Output-5 to Pin-19 (Output) of ICBase-2 (74LS194).
  11. Connect Input-7 to Pin-1 (Input) of ICBase-2 (74LS194).
  12. Connect Input-6 to Pin-7 (Input) of ICBase-2 (74LS194).