ba - Copy

FASEELA
FASEELA KP
Created on May 10, 2021 0 0 2
ba - Copy
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS32).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS32).
  5. Connect Input-15 to Pin-1 (Input) of ICBase-1 (74LS08).
  6. Connect Input-14 to Pin-2 (Input) of ICBase-1 (74LS08).
  7. Connect Pin-1 (Input) of ICBase-2 (74LS32) to Pin-3 (Output) of ICBase-1 (74LS08).
  8. Connect Input-14 to Pin-4 (Input) of ICBase-1 (74LS08).
  9. Connect Input-13 to Pin-5 (Input) of ICBase-1 (74LS08).
  10. Connect Pin-2 (Input) of ICBase-2 (74LS32) to Pin-6 (Output) of ICBase-1 (74LS08).
  11. Connect Output-7 to Pin-3 (Output) of ICBase-2 (74LS32).
  12. Add IC 74LS08 into ICBase-1 (74LS08).
  13. Add IC 74LS32 into ICBase-2 (74LS32).