SR Latch

Kaustubh
Kaustubh Desale
Created on Jul 7, 2021 0 0 1
SR Latch
100%

Integrated Circuits Used

Procedure

  1. Connect Input-3 to Pin-14 (Input) of ICBase-2 (74LS02).
  2. Connect Pin-3 (Input) of ICBase-2 (74LS02) to Pin-16 (Output) of ICBase-2 (74LS02).
  3. Connect Pin-15 (Input) of ICBase-2 (74LS02) to Pin-1 (Output) of ICBase-2 (74LS02).
  4. Connect Output-6 to Pin-16 (Output) of ICBase-2 (74LS02).
  5. Add IC 74LS02 into ICBase-2 (74LS02).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  7. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  8. Connect Input-9 to Pin-2 (Input) of ICBase-2 (74LS02).
  9. Connect Output-7 to Pin-1 (Output) of ICBase-2 (74LS02).