latch

Abhinav
Abhinav Kalvacherla
Created on Jul 7, 2021 0 0 1
latch
100%

Integrated Circuits Used

Procedure

  1. Connect Pin-4 (Output) of ICBase-1 (74LS02) to ICBase-2.
  2. Add IC 74LS02 into ICBase-1 (74LS02).
  3. Connect Input-13 to Pin-2 (Input) of ICBase-1 (74LS02).
  4. Connect Output-11 to Pin-1 (Output) of ICBase-1 (74LS02).
  5. Connect Pin-14 (Input) of ICBase-1 (74LS02) to Input-12.
  6. Connect Pin-1 (Output) of ICBase-1 (74LS02) to Pin-15 (Input) of ICBase-1 (74LS02).
  7. Connect Output-10 to Pin-16 (Output) of ICBase-1 (74LS02).
  8. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS02).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS02).
  10. Connect Pin-16 (Output) of ICBase-1 (74LS02) to Pin-3 (Input) of ICBase-1 (74LS02).