SR latch

Ashutosh
Ashutosh Rai
Created on Jul 13, 2021 0 0 2
SR latch
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-1 (74LS04).
  2. Add IC 74LS02 into ICBase-2 (74LS02).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS04).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS04).
  7. Connect Input-0 to Pin-1 (Input) of ICBase-1 (74LS04).
  8. Connect Input-1 to Pin-2 (Input) of ICBase-2 (74LS02).
  9. Connect Pin-3 (Input) of ICBase-2 (74LS02) to Pin-2 (Output) of ICBase-1 (74LS04).
  10. Connect Output-0 to Pin-1 (Output) of ICBase-2 (74LS02).
  11. Connect Input-2 to Pin-5 (Input) of ICBase-2 (74LS02).
  12. Connect Input-0 to Pin-6 (Input) of ICBase-2 (74LS02).
  13. Connect Output-1 to Pin-4 (Output) of ICBase-2 (74LS02).