SR Latch Date 14-07

Roshin
Roshin Nishad
Created on Jul 13, 2021 0 0 1
SR Latch Date 14-07
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS02 into ICBase-2 (74LS02).
  2. Connect Pin-2 (Input) of ICBase-2 (74LS02) to Input-10.
  3. Connect Pin-5 (Input) of ICBase-2 (74LS02) to Input-8.
  4. Connect Pin-6 (Input) of ICBase-2 (74LS02) to Pin-1 (Output) of ICBase-2 (74LS02).
  5. Connect Pin-3 (Input) of ICBase-2 (74LS02) to Pin-4 (Output) of ICBase-2 (74LS02).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  8. Connect Output-4 to Pin-4 (Output) of ICBase-2 (74LS02).
  9. Connect Output-8 to Pin-1 (Output) of ICBase-2 (74LS02).