SR latch-NOR

Rishabh
Rishabh Srivastava
Created on Jul 13, 2021 0 0 1
SR latch-NOR
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS02).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS02).
  3. Connect Pin-2 (Input) of ICBase-3 (74LS02) to Input-4.
  4. Connect Pin-3 (Input) of ICBase-3 (74LS02) to Pin-19 (Output) of ICBase-3 (74LS02).
  5. Connect Pin-18 (Input) of ICBase-3 (74LS02) to Input-0.
  6. Connect Pin-1 (Output) of ICBase-3 (74LS02) to Pin-17 (Input) of ICBase-3 (74LS02).
  7. Connect Output-0 to Pin-1 (Output) of ICBase-3 (74LS02).
  8. Connect Output-4 to Pin-19 (Output) of ICBase-3 (74LS02).
  9. Add IC 74LS02 into ICBase-3 (74LS02).