15/7 - Question 1

Adithyadev
Adithyadev Mattada
Created on Jul 19, 2021 0 0 1
15/7 - Question 1
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-3 (74LS00).
  2. Connect Pin-20 (VCC) of ICBase-3 (74LS00) to VCC Port.
  3. Connect Pin-7 (Ground) of ICBase-3 (74LS00) to GND Port.
  4. Connect Input-0 to Pin-1 (Input) of ICBase-3 (74LS00).
  5. Connect Pin-2 (Input) of ICBase-3 (74LS00) to Input-0.
  6. Connect Output-0 to Pin-3 (Output) of ICBase-3 (74LS00).