Lab 15/07 Q1

Harisankar
Harisankar S
Created on Jul 18, 2021 0 0 1
Lab 15/07 Q1
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-1 (74LS00).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS00).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  4. Connect Pin-1 (Input) of ICBase-1 (74LS00) to Input-14.
  5. Connect Pin-2 (Input) of ICBase-1 (74LS00) to Input-14.
  6. Connect Output-11 to Pin-3 (Output) of ICBase-1 (74LS00).