Q1 15/07/2021

Vansh
Vansh Jagyasi
Created on Jul 24, 2021 0 0 1
Q1 15/07/2021
100%

Integrated Circuits Used

Procedure

  1. Connect Pin-1 (Input) of ICBase-1 (74LS00) to Input-0.
  2. Connect Pin-2 (Input) of ICBase-1 (74LS00) to Input-0.
  3. Connect Output-0 to Pin-3 (Output) of ICBase-1 (74LS00).
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS00).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  6. Add IC 74LS00 into ICBase-1 (74LS00).