SR Latch

Saket Roshan
Saket Roshan Rai
Created on Jul 7, 2021 0 0 1
SR Latch
100%

Integrated Circuits Used

Procedure

  1. Connect Pin-5 (Input) of ICBase-1 (74LS02) to Input-15.
  2. Connect Pin-2 (Input) of ICBase-1 (74LS02) to Input-14.
  3. Connect Output-15 to Pin-1 (Output) of ICBase-1 (74LS02).
  4. Connect Output-14 to Pin-4 (Output) of ICBase-1 (74LS02).
  5. Add IC 74LS02 into ICBase-1 (74LS02).
  6. Connect Pin-3 (Input) of ICBase-1 (74LS02) to Pin-4 (Output) of ICBase-1 (74LS02).
  7. Connect Pin-6 (Input) of ICBase-1 (74LS02) to Pin-1 (Output) of ICBase-1 (74LS02).
  8. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS02).
  9. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS02).