week-part(2)

Maruthi
Maruthi Phanendra
Created on Jun 10, 2021 0 0 1
week-part(2)
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS00).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  3. Connect Input-0 to Pin-1 (Input) of ICBase-1 (74LS00).
  4. Connect Input-0 to Pin-2 (Input) of ICBase-1 (74LS00).
  5. Connect Input-1 to Pin-4 (Input) of ICBase-1 (74LS00).
  6. Connect Pin-2 (Input) of ICBase-2 (74LS00) to Pin-6 (Output) of ICBase-1 (74LS00).
  7. Connect Pin-1 (Input) of ICBase-2 (74LS00) to Pin-3 (Output) of ICBase-1 (74LS00).
  8. Connect Output-0 to Pin-3 (Output) of ICBase-2 (74LS00).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS00).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS00).
  11. Connect Input-1 to Pin-5 (Input) of ICBase-1 (74LS00).
  12. Add IC 74LS00 into ICBase-1 (74LS00).
  13. Add IC 74LS00 into ICBase-2 (74LS00).