and

UMESH
UMESH P
Created on Jun 16, 2021 0 0 1
and
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS02 into ICBase-1 (74LS02).
  2. Add IC 74LS02 into ICBase-3 (74LS02).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS02).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS02).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS02).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS02).
  7. Connect Pin-2 (Input) of ICBase-1 (74LS02) to Input-15.
  8. Connect Pin-15 (Input) of ICBase-1 (74LS02) to Input-10.
  9. Connect Pin-2 (Input) of ICBase-3 (74LS02) to Pin-1 (Output) of ICBase-1 (74LS02).
  10. Connect Pin-3 (Input) of ICBase-3 (74LS02) to Pin-16 (Output) of ICBase-1 (74LS02).
  11. Connect Output-1 to Pin-1 (Output) of ICBase-3 (74LS02).
  12. Connect Input-15 to Pin-3 (Input) of ICBase-1 (74LS02).
  13. Connect Input-10 to Pin-14 (Input) of ICBase-1 (74LS02).
  14. Connect GND Port to ICBase-1 (74LS02).