Roshini NOR Verification

Roshini
Roshini P
Created on Jun 16, 2021 0 0 3
Roshini NOR Verification
100%

Integrated Circuits Used

Procedure

  1. Connect Pin-15 (Input) of ICBase-1 (74LS04) to Pin-14 (Output) of ICBase-2 (74LS32).
  2. Connect Input-7 to Pin-16 (Input) of ICBase-2 (74LS32).
  3. Connect Output-0 to Pin-1 (Output) of ICBase-3 (74LS02).
  4. Connect Pin-2 (Input) of ICBase-3 (74LS02) to Input-3.
  5. Connect Input-2 to Pin-3 (Input) of ICBase-3 (74LS02).
  6. Connect Output-6 to Pin-14 (Output) of ICBase-1 (74LS04).
  7. Add IC 74LS04 into ICBase-1 (74LS04).
  8. Add IC 74LS32 into ICBase-2 (74LS32).
  9. Add IC 74LS02 into ICBase-3 (74LS02).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS04).
  11. Connect Pin-20 (VCC) of ICBase-2 (74LS32) to VCC Port.
  12. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS02).
  13. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS04).
  14. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS02).
  15. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS32).
  16. Connect Input-6 to Pin-15 (Input) of ICBase-2 (74LS32).