IEC lab 16 June 2021 1 Q

Harshaa Reddy
Harshaa Reddy G
Created on Jun 16, 2021 0 0 1
IEC lab 16 June 2021 1 Q
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS02 into ICBase-2 (74LS02).
  2. Connect Pin-7 (Ground) of ICBase-2 (74LS02) to GND Port.
  3. Connect Pin-20 (VCC) of ICBase-2 (74LS02) to VCC Port.
  4. Connect Input-9 to Pin-2 (Input) of ICBase-2 (74LS02).
  5. Connect Input-8 to Pin-3 (Input) of ICBase-2 (74LS02).
  6. Connect Output-9 to Pin-1 (Output) of ICBase-2 (74LS02).