SR LATCH

Ibrahim
Ibrahim Khan
Created on Jul 13, 2021 0 0 1
SR LATCH
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS02 into ICBase-3 (74LS02).
  2. Connect Pin-20 (VCC) of ICBase-3 (74LS02) to VCC Port.
  3. Connect Pin-7 (Ground) of ICBase-3 (74LS02) to GND Port.
  4. Connect Pin-2 (Input) of ICBase-3 (74LS02) to Input-3.
  5. Connect Pin-18 (Input) of ICBase-3 (74LS02) to Input-2.
  6. Connect Output-0 to Pin-19 (Output) of ICBase-3 (74LS02).
  7. Connect Output-1 to Pin-1 (Output) of ICBase-3 (74LS02).
  8. Connect Pin-17 (Input) of ICBase-3 (74LS02) to Pin-1 (Output) of ICBase-3 (74LS02).
  9. Connect Pin-3 (Input) of ICBase-3 (74LS02) to Pin-19 (Output) of ICBase-3 (74LS02).