YOGESH

yogesh
yogesh raj
Created on Jul 9, 2021 0 0 2
YOGESH
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS08).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS04).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS04).
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS08).
  5. Connect Pin-2 (Output) of ICBase-3 (74LS04) to Pin-1 (Input) of ICBase-2 (74LS08).
  6. Connect Input-0 to Pin-1 (Input) of ICBase-3 (74LS04).
  7. Connect Input-0 to Pin-4 (Input) of ICBase-2 (74LS08).
  8. Connect Output-1 to Pin-6 (Output) of ICBase-2 (74LS08).
  9. Connect Pin-3 (Output) of ICBase-2 (74LS08) to Output-0.
  10. Connect Input-9 to Pin-2 (Input) of ICBase-2 (74LS08).
  11. Connect Input-9 to Pin-5 (Input) of ICBase-2 (74LS08).
  12. Add IC 74LS08 into ICBase-2 (74LS08).
  13. Add IC 74LS04 into ICBase-3 (74LS04).