HALF SUB

Ashwin
Ashwin Chavan
Created on Jan 12, 2021 0 0 3
HALF SUB
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS86 into ICBase-1 (74LS86).
  2. Add IC 74LS04 into ICBase-2 (74LS04).
  3. Connect Pin-1 (Input) of ICBase-1 (74LS86) to Input-14.
  4. Add IC 74LS08 into ICBase-3 (74LS08).
  5. Connect Input-15 to Pin-2 (Input) of ICBase-1 (74LS86).
  6. Connect Output-14 to Pin-3 (Output) of ICBase-1 (74LS86).
  7. Connect Input-14 to Pin-1 (Input) of ICBase-2 (74LS04).
  8. Connect Pin-2 (Input) of ICBase-3 (74LS08) to Pin-2 (Output) of ICBase-2 (74LS04).
  9. Connect Output-15 to Pin-3 (Output) of ICBase-3 (74LS08).
  10. Connect Input-15 to Pin-1 (Input) of ICBase-3 (74LS08).
  11. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS08).
  12. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).
  13. Connect GND Port to Pin-6 (Output) of ICBase-1 (74LS86).
  14. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).
  15. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS08).
  16. Connect Pin-20 (VCC) of ICBase-1 (74LS86) to VCC Port.
  17. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS86).
  18. Connect VCC Port to ICBase-1 (74LS86).